Lapse grace period.

Lapse grace period. During the 12-month grace period referenced in paragraphs (b)(3), (c)(3), and (e) of this section, a project may be found to conform according to the requirements of this part if:
(1) The project is included in the currently conforming transportation plan and TIP (or regional emissions analysis); or
(2) the project is included in the most recent conforming transportation plan and TIP (or regional emissions analysis).

Source

40 CFR § 93.104


Scoping language

None
Is this correct? or