Periodic application of cover material

(4) Periodic application of cover material means the application and compaction of soil or other suitable material over disposed solid waste at the end of each operating day or at such frequencies and in such a manner as to reduce the risk of fire and to impede vectors access to the waste. (5) Trenching or burial operation means the placement of sewage sludge or septic tank pumpings in a trench or other natural or man-made depression and the covering with soil or other suitable material at the end of each operating day such that the wastes do not migrate to the surface.

Source

40 CFR § 257.3-6


Scoping language

None
Is this correct? or