e.g

(ii) For leak detection monitoring and inspections required by paragraphs 63.11495(a)(6) (e.g., monitoring using Method 21 of appendix A-7 to part 60 of this chapter; visible, audible, or olfactory monitoring; closed vent system inspections; and batch process unit monitoring), record the date of the monitoring or inspection and include a statement of whether leaks were detected. If no leaks are detected, records of the monitoring and inspection results are not required. (iii) When each leak is detected as specified in 63.11495(a)(6), the following information must be recorded: (A) The instrument and the equipment identification number and the operator name, initials, or identification number. (B) The date the leak was detected and the date of first attempt to repair the leak. (C) The date of successful repair of the leak. (D) Maximum instrument reading measured by Method 21 of 40 CFR part 60, appendix A-7 of this chapter after it is successfully repaired or determined to be nonrepairable. (E) Repair delayed and the reason for the delay if a leak is not repaired within 15 calendar days after discovery of the leak.

Source

40 CFR § 63.11501


Scoping language

None
Is this correct? or