Construction.

S6.11.1 Construction. Construct the salt spray chamber so that:
(a) The construction material does not affect the corrosiveness of the fog.
(b) The hose assembly is supported or suspended 30 degrees from the vertical and parallel to the principal direction of the horizontal flow of fog through the chamber.
(c) The hose assembly does not contact any metallic material or any material capable of acting as a wick
(d) Condensation which falls from the assembly does not return to the solution reservoir for respraying.
(e) Condensation from any source does not fall on the brake hose assemblies or the solution collectors.
(f) Spray from the nozzles is not directed onto the hose assembly.

Source

49 CFR § 571.106


Scoping language

None