Submerged loading pipe

Submerged loading pipe means any discharge pipe or nozzle which meets either of the following conditions:
(A) Where the tank is filled from the top, the end of the discharge pipe or nozzle must be totally submerged when the liquid level is 15 cm (6 in.) above the bottom of the tank.
(B) Where the tank is filled from the side, the discharge pipe or nozzle must be totally submerged when the liquid level is 46 cm (18 in.) above the bottom of the tank.

Source

40 CFR § 52.741


Scoping language

None