Storage vessel affected facility
(i) Storage vessel affected facility. For each storage vessel affected facility, you must demonstrate continuous compliance with the requirements of 60.5395b according to paragraphs (i)(1) through (10) of this section, as applicable. (1) For each storage vessel affected facility complying with the requirements of 60.5395b(a)(2), you must demonstrate continuous compliance according to paragraphs (i)(5), (9) and (10) of this section. (2) For each storage vessel affected facility complying with the requirements of 60.5395b(a)(3), you must demonstrate continuous compliance according to paragraphs (i)(2)(i), (ii), or (iii) of this section, as applicable, and (i)(9) and (10) of this section. (i) You must maintain the uncontrolled actual VOC emissions at less than 4 tpy and the uncontrolled actual methane emissions at less than 14 tpy from the storage vessel affected facility. (ii) You must comply with paragraph (i)(5) of this section as soon as liquids from the well are routed to the storage vessel affected facility following fracturing or refracturing according to the requirements of 60.5395b(a)(3)(i). (iii) You must comply with paragraph (i)(5) of this section within 30 days of the monthly determination according to the requirements of 60.5395b(a)(3)(ii), where the monthly emissions determination indicates that VOC emissions from your storage vessel affected facility increase to 4 tpy or greater or methane emissions from your storage vessel affected facility increase to 14 tpy or greater and the increase is not associated with fracturing or refracturing of a well feeding the storage vessel affected facility. (3) For each storage vessel affected facility or portion of a storage vessel affected facility removed from service, you must demonstrate compliance with the requirements of 60.5395b(c)(1) or (2) by complying with paragraphs (i)(6), (7), (9), and (10) of this section. (4) For each storage vessel affected facility or portion of a storage vessel affected facility returned to service, you must demonstrate compliance with the requirements of 60.5395b(c)(3) and (4) by complying with paragraphs (i)(8) through (10) of this section. (5) For each storage vessel affected facility, you must comply with paragraphs (i)(5)(i) and (ii) of this section. (i) You must reduce VOC emissions as specified in 60.5395b(a)(2). (ii) For each control device installed to meet the requirements of 60.5395b(a)(2), you must demonstrate continuous compliance with the performance requirements of 60.5412b for each storage vessel affected facility using the procedure specified in paragraphs (i)(5)(ii)(A) and (i)(5)(ii)(B) of this section. When routing emissions to a process, you must demonstrate continuous compliance as specified in paragraph (i)(5)(ii)(A) of this section. (A) You must comply with 60.5416b for each cover and closed vent system. (B) You must comply with the requirements specified in paragraph (f) of this section. (6) You must completely empty and degas each storage vessel, such that each storage vessel no longer contains crude oil, condensate, produced water or intermediate hydrocarbon liquids. For a portion of a storage vessel affected facility to be removed from service, you must completely empty and degas the storage vessel(s), such that the storage vessel(s) no longer contains crude oil, condensate, produced water, or intermediate hydrocarbon liquids. A storage vessel where liquid is left on walls, as bottom clingage, or in pools due to floor irregularity is considered to be completely empty. (7) You must disconnect the storage vessel(s) from the tank battery by isolating the storage vessel(s) from the tank battery such that the storage vessel(s) is no longer manifolded to the tank battery by liquid or vapor transfer. (8) You must determine the affected facility status of a storage vessel returned to service as provided in 60.5365b(e)(6). (9) You must submit the annual reports as required by 60.5420b(b)(1), (8), and (11)(i) through (iv). (10) You must maintain the records as required by 60.5420b(c)(7) through (10) and (c)(12), as applicable.