Recovery period
Recovery period means either the longest length of time required to return the services of the injured resource to their baseline condition, or a lesser period of time selected by the authorized official and documented in the Assessment Plan.
Source
43 CFR § 11.14
Scoping language
Terms not defined in this section have the meaning given by CERCLA or the CWA. As used in this part, the phrase: