Change

(i) Change means an action that results in modification or addition to, or removal from, the licensee's emergency plan. All such changes are subject to the provisions of this section except where the applicable regulations establish specific criteria for accomplishing a particular change. (ii) Emergency plan means the document(s), prepared and maintained by the licensee, that identify and describe the licensee's methods for maintaining emergency preparedness and responding to emergencies. An emergency plan includes the plan as originally approved by the NRC and all subsequent changes made by the licensee with, and without, prior NRC review and approval under paragraph (q) of this section. (iii) Emergency planning function means a capability or resource necessary to prepare for and respond to a radiological emergency. (iv) Reduction in effectiveness means a change in an emergency plan that results in reducing the licensee's capability to perform an emergency planning function in the event of a radiological emergency. (2) (i) Except as provided in paragraph (q)(2)(ii) of this section, a holder of a license under this part, or a combined license under part 52 of this chapter after the Commission makes the finding under 52.103(g) of this chapter, shall follow and maintain the effectiveness of an emergency plan that meets the requirements in appendix E to this part and, for nuclear power reactor licensees, the planning standards of 50.47(b). (ii) A holder of a license under this part for a non-power production or utilization facility, a holder of a license under this part for a small modular reactor or a non-light water reactor, or a holder of a combined license under part 52 of this chapter after the Commission makes the finding under 52.103(g) of this chapter for a small modular reactor or a non-light-water reactor, shall follow and maintain the effectiveness of either an emergency plan that meets the requirements in 50.160 or an emergency plan that meets the requirements in appendix E to this part and, for nuclear power reactor licensees, the planning standards of 50.47(b). (3) (i) Except as provided in paragraph (q)(3)(ii) of this section, the licensee may make changes to its emergency plan without NRC approval only if the licensee performs and retains an analysis demonstrating that the changes do not reduce the effectiveness of the plan and the plan, as changed, continues to meet the requirements in appendix E to this part and, for nuclear power reactor licensees, the planning standards of 50.47(b). (ii) A non-power production or utilization facility, small modular reactor, or non-light-water reactor licensee may make changes to its emergency plan without NRC approval only if the licensee performs and retains an analysis demonstrating that the changes do not reduce the effectiveness of the plan and the plan, as changed, continues to meet either the requirements in 50.160 or the requirements in appendix E to this part and, for nuclear power reactor licensees, the planning standards of 50.47(b). (4) The changes to a licensee's emergency plan that reduce the effectiveness of the plan as defined in paragraph (q)(1)(iv) of this section may not be implemented without prior approval by the NRC. A licensee desiring to make such a change shall submit an application for an amendment to its license. In addition to the filing requirements of 50.90 and 50.91, the request must include all emergency plan pages affected by that change and must be accompanied by a forwarding letter identifying the change, the reason for the change, and the basis for concluding that the licensee's emergency plan, as revised, will continue to meet either the requirements in 50.160 or the requirements in appendix E to this part and, for nuclear power reactor licensees, the planning standards of 50.47(b). (5) The licensee shall retain a record of each change to the emergency plan made without prior NRC approval for a period of three years from the date of the change and shall submit, as specified in 50.4, a report of each such change, including a summary of its analysis, within 30 days after the change is put in effect. (6) The nuclear power reactor licensee shall retain the emergency plan and each change for which prior NRC approval was obtained pursuant to paragraph (q)(4) of this section as a record until the Commission terminates the license for the nuclear power reactor. (7) Each holder of an operating license under this part or a combined license under part 52 of this chapter for a small modular reactor or non-light-water reactor or each holder of an operating license under this part issued after December 18, 2023 for a non-power production or utilization facility that wishes to transition to 50.160 shall submit to the Commission, as specified in 50.90, a license amendment request for implementing an emergency preparedness program with the associated plan modification necessary to meet the requirements of 50.160(b). This submittal must include an explanation of the schedule and analyses supporting the implementation of the emergency preparedness program.

Source

10 CFR § 50.54


Scoping language

None
Is this correct? or