Final cost objective
Final cost objective means (except for subparts 31.3 and 31.6) a cost objective that has allocated to it both direct and indirect costs and, in the contractors accumulation system, is one of the final accumulation points.
Source
48 CFR § 31.001
Scoping language
As used in this part
Is this correct?
or