Pre-stagnation flushing

Pre-stagnation flushing is the opening of tap to flush standing water from plumbing prior to the minimum 6-hour stagnation period in anticipation of lead and copper tap sampling under subpart I of this part.

Source

40 CFR § 141.2


Scoping language

As used in this part, the term:

Is this correct? or