For the purposes of this section, rail-mounted cranes

(g) Rail-mounted cranes (excluding locomotive types). (1) For the purposes of this section, rail-mounted cranes include bridge cranes and portal cranes. (2) Rated load marking. The rated loads of bridge cranes shall be plainly marked on each side of the crane and in the cab. If there is more than one hoisting unit, each hoist shall have its rated load marked on it or on its load block. Marking shall be legible from the ground level. (3) Wind-indicating devices. (i) After October 3, 1983, each rail-mounted bridge and portal crane located outside of an enclosed structure shall be fitted with an operable wind-indicating device. (ii) The wind indicating device shall provide a visible or audible warning to alert the operator of high wind conditions. That warning shall be transmitted whenever the following circumstances are present: (A) When wind velocity reaches the warning speed, not exceeding the crane manufacturer's recommendations; and (B) When wind velocity reaches the shutdown speed, not exceeding the crane manufacturer's recommendations, at which work is to be stopped and the crane secured. (iii) Instructions. The employer shall post operating instructions for high wind conditions in the operator's cab of each crane. Operators shall be directed to comply with these instructions. The instructions shall include procedures for responding to high wind alerts and for any coordination necessary with other cranes. (4) Securing of cranes in high winds. (i) When the wind reaches the crane's warning speed: (A) Gantry travel shall be stopped; and (B) The crane shall be readied for shutdown. (ii) When the wind reaches the crane's shutdown speed: (A) Any portion of the crane spanning or partially spanning a vessel shall be moved clear of the vessel if safe to do so; and (B) The crane shall be secured against travel, using all available means of securing. (5) The employer shall monitor local weather conditions by subscribing to a weather service or using equally effective means. (6) Stops and bumpers. (i) The ends of all tracks shall be equipped with stops or bumpers. If a stop engages the tread of the wheel, it shall be of a height not less than the radius of the wheel. (ii) When more than one crane operates on the same runway or more than one trolley on the same bridge, each crane or trolley shall be equipped with bumpers or equivalent devices at adjacent ends subject to impact. (7) Employee exposure to crane movement. When employees may be in the vicinity of the tracks, crane trucks shall be equipped with personnel-deflecting guards. (8) Pedestrian clearance. If the track area is used for employee passage or for work, a minimum clearance of three feet (.91 m) shall be provided between trucks or the structures of rail-mounted cranes and any other structure or obstruction. When the required clearance is not available on at least one side of the crane's trucks, the area shall not be used and shall be marked and identified. (9) Warning devices. Rail-mounted cranes shall be equipped with an effective travel warning device which shall be used to warn employees who may be in the path of the moving crane. (10) Communications. Means of communication shall be provided between the operator's cab and the base of the gantry of all rail-mounted cranes. This requirement may be met by telephone, radio, sound-signalling system or other effective methods, but not solely by hand-signalling. (11) Limit switch bypass systems shall be secured during all cargo operations. Such bypass systems shall not be used except in an emergency or during non-cargo handling operations such as stowing cranes or derricks or performing repairs. When a situation requiring the use of a bypass system or the readjustment of a limit switch arises, it shall be done only under the direction of a crane mechanic.

Source

29 CFR § 1917.45


Scoping language

For the purposes of this section
Is this correct? or