(i)
(i) The period in which the inlet to the control device will contain at least 50 percent of the maximum HAP load (in lbs) capable of being vented to the control device over any 8-hour period. An emission profile as described in paragraph (c)(3)(i)(B)(3)(i) of this section shall be used to identify the 8-hour period that includes the maximum projected HAP load.