qualified hydropower production

(8) Qualified hydropower production (A) In general The term “qualified hydropower production” means— (i) in the case of any hydroelectric dam which was placed in service on or before the date of the enactment of this paragraph, the incremental hydropower production for the taxable year, and (ii) in the case of any nonhydroelectric dam described in subparagraph (C), the hydropower production from the facility for the taxable year. (B) Determination of incremental hydropower production (i) In general For purposes of subparagraph (A), incremental hydropower production for any taxable year shall be equal to the percentage of average annual hydropower production at the facility attributable to the efficiency improvements or additions of capacity placed in service after the date of the enactment of this paragraph, determined by using the same water flow information used to determine an historic average annual hydropower production baseline for such facility. Such percentage and baseline shall be certified by the Federal Energy Regulatory Commission. (ii) Operational changes disregarded For purposes of clause (i), the determination of incremental hydropower production shall not be based on any operational changes at such facility not directly associated with the efficiency improvements or additions of capacity. (C) Nonhydroelectric dam For purposes of subparagraph (A), a facility is described in this subparagraph if— (i) the hydroelectric project installed on the nonhydroelectric dam is licensed by the Federal Energy Regulatory Commission and meets all other applicable environmental, licensing, and regulatory requirements, (ii) the nonhydroelectric dam was placed in service before the date of the enactment of this paragraph and operated for flood control, navigation, or water supply purposes and did not produce hydroelectric power on the date of the enactment of this paragraph, and (iii) the hydroelectric project is operated so that the water surface elevation at any given location and time that would have occurred in the absence of the hydroelectric project is maintained, subject to any license requirements imposed under applicable law that change the water surface elevation for the purpose of improving environmental quality of the affected waterway. The Secretary, in consultation with the Federal Energy Regulatory Commission, shall certify if a hydroelectric project licensed at a nonhydroelectric dam meets the criteria in clause (iii). Nothing in this section shall affect the standards under which the Federal Energy Regulatory Commission issues licenses for and regulates hydropower projects under part I of the Federal Power Act.

Source

26 USC § 45(c)(8)


Scoping language

in this subparagraph
Is this correct? or