construction

(c)When in the opinion of the Chief of Engineers the most suitable and economical remedial measures would be provided by periodic beach nourishment, the term “construction” may be construed for the purposes ofto include the deposit of sand fill at suitable intervals of time to furnish sand supply to project shores for a length of time specified by the Chief of Engineers. (d)Shores other than public will be eligible for Federal assistance if there is benefit such as that arising from public use or from the protection of nearby public property or if the benefits to those shores are incidental to the project, and the Federal contribution to the project shall be adjusted in accordance with the degree of such benefits. (e)

Source

33 USC § 426e(c)