affected State or States

(a) Plans, proposals, or reports of the Chief of Engineers, Department of the Army, for any works of improvement for navigation or flood control not heretofore or herein authorized, shall be submitted to the Congress only upon compliance with the provisions of this paragraph (a). Investigations which form the basis of any such plans, proposals, or reports shall be conducted in such a manner as to give to the affected State or States, during the course of the investigations, information developed by the investigations and also opportunity for consultation regarding plans and proposals, and, to the extent deemed practicable by the Chief of Engineers, opportunity to cooperate in the investigations. If such investigations in whole or part are concerned with the use or control of waters arising west of the ninety-seventh meridian, the Chief of Engineers shall give to the Secretary of the Interior, during the course of the investigations, information developed by the investigations and also opportunity for consultation regarding plans and proposals, and to the extent deemed practicable by the Chief of Engineers, opportunity to cooperate in the investigations. The relations of the Chief of Engineers with any State under this paragraph (a) shall be with the Governor of the State or such official or agency of the State as the Governor may designate. The term “affected State or States” shall include those in which the works or any part thereof are proposed to be located; those which in whole or part are both within the drainage basin involved and situated in a State lying wholly or in part west of the ninety-eighth meridian; and such of those which are east of the ninety-eighth meridian as, in the judgment of the Chief of Engineers, will be substantially affected. Such plans, proposals, or reports and related investigations shall be made to the end, among other things, of facilitating the coordination of plans for the construction and operation of the proposed works with other plans involving the waters which would be used or controlled by such proposed works. Each report submitting any such plans or proposals to the Congress shall set out therein, among other things, the relationship between the plans for construction and operation of the proposed works and the plans, if any, submitted by the affected States and by the Secretary of the Interior. The Chief of Engineers shall transmit a copy of his proposed report to each affected State, and, in case the plans or proposals covered by the report are concerned with the use or control of waters which rise in whole or in part west of the ninety-seventh meridian, to the Secretary of the Interior. Within 30 days from the date of receipt of said proposed report, the written views and recommendations of each affected State and of the Secretary of the Interior may be submitted to the Chief of Engineers. The Secretary of the Army shall transmit to the Congress, with such comments and recommendations as he deems appropriate, the proposed report together with the submitted views and recommendations of affected States and of the Secretary of the Interior. The Secretary of the Army may prepare and make said transmittal any time following said 30-day period. The letter of transmittal and its attachments shall be printed as a House or Senate document and shall be made publicly available.

Source

33 USC § 701-1


Scoping language

None identified, default scope is assumed to be the parent (chapter 15) of this section.
Is this correct? or