general navigation features

(5) Dredged material disposal facilities for project construction In this subsection, the term “general navigation features” includes constructed land-based and aquatic dredged material disposal facilities that are necessary for the disposal of dredged material required for project construction and for which a contract for construction has not been awarded on or before October 12, 1996 .

Source

33 USC § 2211(a)(5)


Scoping language

In this subsection
Is this correct? or