airport development

(3) “airport development” means the following activities, if undertaken by the sponsor, owner, or operator of a public-use airport: (A) constructing, repairing, or improving a public-use airport, including— (i) removing, lowering, relocating, marking, and lighting an airport hazard; (ii) preparing a plan or specification, including carrying out a field investigation; and (iii) a secondary runway at a nonhub airport that is equivalent in size and type to the primary runway of such airport. (B) acquiring for, or installing at, a public-use airport— (i) a navigation aid or another aid (including a precision approach system) used by aircraft for landing at or taking off from the airport, including preparing the site as required by the acquisition or installation; (ii) safety or security equipment, including explosive detection devices, universal access systems, and emergency call boxes, the Secretary requires by regulation for, or approves as contributing significantly to, the safety or security of individuals and property at the airport and integrated in-pavement lighting systems for runways and taxiways and other runway and taxiway incursion prevention devices; (iii) equipment to remove snow, to measure runway surface friction, or for aviation-related weather reporting, including closed circuit weather surveillance equipment and fuel infrastructure for such equipment to remove snow if the airport is located in Alaska; (iv) firefighting and rescue equipment at an airport that serves scheduled passenger operations of air carrier aircraft designed for more than 9 passenger seats; (v) aircraft deicing equipment and structures (except aircraft deicing fluids and storage facilities for the equipment and fluids); (vi) interactive training systems; (vii) windshear detection equipment that is certified by the Administrator of the Federal Aviation Administration; (viii) stainless steel adjustable lighting extensions approved by the Administrator; (ix) engineered materials arresting systems as described in the Advisory Circular No. 150/5220–22 published by the Federal Aviation Administration on August 21, 1998 , including any revision to the circular; (x) replacement of baggage conveyor systems, and reconfiguration of terminal baggage areas, that the Secretary determines are necessary to install bulk explosive detection devices; except that such activities shall be eligible for funding under this subchapter only using amounts apportioned under section 47114; and (xi) a medium intensity approach lighting system with runway alignment indicator lights. (C) acquiring an interest in land or airspace, including land for future airport development, that is needed— (i) to carry out airport development described in subclause (A) or (B) of this clause; or (ii) to remove or mitigate an existing airport hazard or prevent or limit the creation of a new airport hazard. (D) acquiring land for, or constructing, a burn area training structure on or off the airport to provide live fire drill training for aircraft rescue and firefighting personnel required to receive the training under regulations the Secretary prescribes, including basic equipment and minimum structures to support the training under standards the Administrator of the Federal Aviation Administration prescribes. (E) relocating an air traffic control tower and any navigational aid (including radar) if the relocation is necessary to carry out a project approved by the Secretary under this subchapter or under section 40117. (F) constructing, reconstructing, repairing, or improving an airport, or purchasing capital equipment for an airport, if necessary for compliance with the responsibilities of the operator or owner of the airport under the Americans with Disabilities Act of 1990 ( 42 U.S.C. 12101 et seq.), the Clean Air Act ( 42 U.S.C. 7401 et seq.), and the Federal Water Pollution Control Act ( 33 U.S.C. 1251 et seq.), except constructing or purchasing capital equipment that would benefit primarily a revenue-producing area of the airport used by a nonaeronautical business. (G) acquiring land for, or work necessary to construct, a pad suitable for deicing aircraft before takeoff at a commercial service airport, including constructing or reconstructing paved areas, drainage collection structures, treatment and discharge systems, appropriate lighting, paved access for deicing vehicles and aircraft, and including acquiring glycol recovery vehicles, but not including acquiring aircraft deicing fluids or constructing or reconstructing storage facilities for aircraft deicing equipment or fluids. (H) routine work to preserve and extend the useful life of runways, taxiways, and aprons at nonhub airports and airports that are not primary airports, under guidelines issued by the Administrator of the Federal Aviation Administration. (I) constructing, reconstructing, or improving an airport, or purchasing nonrevenue generating capital equipment to be owned by an airport, for the purpose of transferring passengers, cargo, or baggage between the aeronautical and ground transportation modes on airport property. (J) constructing an air traffic control tower or acquiring and installing air traffic control, communications, and related equipment at an air traffic control tower under the terms specified in section 47124(b)(4). (K) work necessary to construct or modify airport facilities to provide low-emission fuel systems, gate electrification, and other related air quality improvements at a commercial service airport. (L) a project by a commercial service airport for the acquisition of airport-owned vehicles or ground support equipment equipped with low-emission technology if the vehicles are; (i) used exclusively on airport property; or (ii) used exclusively to transport passengers and employees between the airport and the airport’s consolidated rental car facility or an intermodal surface transportation facility adjacent to the airport. (M) construction of mobile refueler parking within a fuel farm at a nonprimary airport meeting the requirements of section 112.8 of title 40, Code of Federal Regulations . (N) terminal development under section 47119(a). (O) acquiring and installing facilities and equipment to provide air conditioning, heating, or electric power from terminal-based, nonexclusive use facilities to aircraft parked at a public use airport for the purpose of reducing energy use or harmful emissions as compared to the provision of such air conditioning, heating, or electric power from aircraft-based systems. (P) an on-airport project to improve reliability and efficiency of the power supply of the airport or meet current and future electrical power demand and to prevent power disruptions to the airfield, passenger terminal, and any other airport facilities, including the acquisition and installation of electrical generators, renewable energy generation and storage infrastructure (including necessary substation upgrades to support such infrastructure), separation of the airport’s main power supply from its redundant power supply, the construction or modification of airport facilities to install a microgrid (as defined in section 641 of the United States Energy Storage Competitiveness Act of 2007 ( 42 U.S.C. 17231 )), and smart glass (including electrochromic glass). (Q) converting or retrofitting vehicles and ground support equipment into eligible zero-emission vehicles and equipment (as defined in section 47136) and for acquiring, by purchase or lease, eligible zero-emission vehicles and equipment. (R) predevelopment planning, including financial, legal, or procurement consulting services, related to an application or proposed application for an exemption under section 47134. (S) acquisition of advanced digital construction management systems and related technology used in the planning, design and engineering, construction, and maintenance of airport facilities when such systems or technologies are acquired to carry out a project approved by the Secretary under this subchapter. (T) improvements, or planning for improvements (including monitoring equipment or services), that would be necessary to sustain commercial service flight operations or permit the resumption of such flight operations following a natural disaster (including an earthquake, flooding, high water, wildfires, hurricane, storm surge, tidal wave, tornado, tsunami, wind driven water, sea level rise, tropical storm, cyclone, land instability, or winter storm) at— (i) a primary airport; or (ii) a nonprimary airport that is designated as a Federal staging area or incident support base by the Administrator of the Federal Emergency Management Agency. (U) a project to comply with rulemakings and recommendations on airport cybersecurity standards from the aviation rulemaking committee convened under section 395 of the FAA Reauthorization Act of 2024. (V) reconstructing or rehabilitating an existing crosswind runway (regardless of the wind coverage of the primary runway) if the reconstruction or rehabilitation of such crosswind runway is in the most recently approved airport layout plan of the sponsor. (W) constructing or acquiring such airport-owned infrastructure or equipment, notwithstanding revenue producing capability of such infrastructure or equipment, as may be required for— (i) the on-airport distribution or storage of unleaded aviation gasoline for piston-driven aircraft, including on-airport construction or expansion of pipelines, storage tanks, low-emission fuel systems, and airport-owned fuel trucks providing exclusively unleaded aviation fuels (unless the Secretary determines that an alternative fuel may be safely used in such fuel truck for a limited time); or (ii) fueling systems for type certificated hydrogen-powered aircraft. (X) constructing, reconstructing, or rehabilitating a taxiway or taxilane that serves non-exclusive use aeronautical facilities, including aircraft storage facilities, except for the 50 feet of pavement immediately in front of an ineligible building. (Y) any other activity (excluding terminal development) that the Secretary concludes will reasonably improve the safety of the airport.

Source

49 USC § 47102(3)


Scoping language

In this subchapter
Is this correct? or