significant cost growth threshold

(10) The term “significant cost growth threshold” means the percentage increase in the total acquisition cost for a major system of at least 15 percent over the total acquisition cost for such system as shown in the current Baseline Estimate for such system.

Source

50 USC § 3101(a)(10)


Scoping language

In this section
Is this correct? or