Ala. Admin. Code r. 335-10-1-.04 - Staffing Requirements
(1) All
water treatment plants, wastewater treatment plants, water distribution
systems, and public wastewater collection systems are required to be operated
by an operator certified in accordance with the provisions of this Chapter as
competent to operate the classification of plants or systems to which the plant
or system is classified.
(2) All
Grade IV surface water treatment plants must have a certified operator of the
same grade present at the plant during all hours of operation. A permanent
record of daily operator staffing shall be maintained at all Grade IV
facilities. This record must contain the operator's name, time of arrival and
departure, and the operator's signature. Effective April 1, 2008, any Grade IV
facility with a filtration rate in excess of two gallons per minute per square
foot of filter area must have an unrestricted Grade IV operator present at the
plant during all hours of operation.
(3) All Grade III advanced groundwater plants
must have a certified operator of the same grade or higher present as directed
by the Department. A permanent record of daily operator staffing shall be
maintained at all Grade III and IV facilities. This record must contain the
operator's name, time of arrival and departure, and the operator's
signature.
(4) All Grade III
wastewater treatment plants must have a certified operator of the same grade or
higher present at the plant for a minimum of one 8-hour work shift during the
daytime hours of plant operation, five days a week. For all other days of plant
operation, at a minimum, a certified operator Grade II or higher must operate
the facility one 8-hour work shift during the daytime hours. A permanent record
of daily operator staffing shall be maintained at all Grade III facilities.
This record must contain the operator's name, time of arrival and departure,
and the operator's signature. Upon demonstration and approval of a facility's
ability to be remotely monitored, the Department may waive all or part of the
staffing requirements in excess of the five 8-hour shifts by a Grade III or
higher.
(5) All Grade IV wastewater
treatment plants must have a certified operator of the same grade present at
the plant for a minimum of one 8-hour work shift during the daytime hours of
plant operation. For all other times of operation, as a minimum, a certified
operator Grade II or higher may operate the facility if the Grade IV operator
is available on call within 30 minutes of the plant site. A permanent record of
daily operator staffing shall be maintained at all Grade IV facilities. This
record must contain the operator's name, time of arrival and departure, and the
operator's signature.
(6) All Grade
I water distribution systems, Grade I wastewater treatment plants, public
wastewater or collection systems, and Grade II water or wastewater treatment
plants must have a certified operator of the same grade or higher present at
the plant or system at all times necessary to ensure its safe, efficient, and
proper operation. A permanent record of daily operator staffing shall be
maintained at all Grade I & II wastewater treatment plants and at all Grade
II water treatment plants or well sites. This record must contain the
operator's name, time of arrival and departure, and the operator's signature.
All Grade I wastewater treatment plants and Grade II water and wastewater
treatment plants must be visited, as a minimum, once every seven days by a
certified operator of the same grade or higher unless the facility's operating
permit calls for more frequent site visits.
(7) A certified operator may operate more
than one plant or system only if he provides written assurance to the
Department, in such form as the Department may provide, that he can ensure the
safe, efficient and proper operation of all plants and systems he operates.
Operation must be limited to plants or systems classified at or lower than the
grade of the operator. All staffing requirements applicable to the systems or
plants to be operated must be followed.
Notes
Authors: Joe Alan Power, Aubrey White
Statutory Authority: Code of Ala. 1975, ยงยง 22-22A-5, 22-22A-6, 22-22A-8, 22-25-11, 22-25-13.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.