Ala. Admin. Code r. 335-13-4-.12 - Plans and Operational Reports
(1)
Compliance.
Plans and operational reports for construction, operation, maintenance,
closure, and post-closure care of landfill units shall be prepared and kept on
site and shall comply with
335-13-5-.02(1)
and this chapter.
(2)
Plan Requirements. These plans and reports shall
include the following as determined necessary by the Department:
(a) Sufficient control points on-site to
provide for accurate horizontal and vertical control for facility construction,
operation and closure and post-closure.
(b) Detail presentation of geological and
hydrogeological units in the disposal site, with typical sections of disposal
method and plan and profile sheets on all areas or trenches.
(c) Boundary plat and legal property
description prepared, signed, and sealed by a land surveyor of the proposed
boundary of the facility and disposal area of the facility.
(d) Initial and final topographical maps at
contour intervals of five feet or as otherwise specified by the
Department.
(e) Existing and
proposed surface drainage pattern to include control structures designed to
handle run-on and run-off. Design calculations for sediment control basins,
etc. should be provided.
(f) Buffer
zones, screening and other aesthetic control measures. Buffer zones around the
perimeter of the landfill unit shall be a minimum of 100 feet in width measured
in a horizontal plane. No disposal or storage practices for waste shall take
place in the buffer zone. Roads, access control measures, earth storage, and
buildings may be placed in the buffer zone.
(g) Details of plans for permanent all
weather access roads.
(h) A summary
of 335-13-4-.01 standards and
conclusions of action to be taken and implemented into facility
design.
(i) Location of any areas
of the facility used for disposal of solid wastes.
(j) Presentation of special engineering
features or considerations which must be included or maintained in facility
construction, operation, maintenance and closure. Items required in
335-13-4-.12 through
335-13-4-.20 shall be
included.
(k) Quality
assurance/quality control (QA/QC) plan for all components of the liner,
leachate collection, and cap systems.
(l) Location of all explosive gas wells
and/or monitoring points.
Notes
Authors: Russell A. Kelly, S. Scott Story
Statutory Authority: Code of Ala. 1975, ยงยง 22-27-3, 22-27-7.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.