Contingency plan and emergency procedures. Owners and operators of used oil processing and re-refining facilities must comply with the following requirements:
1. Purpose and implementation of contingency plan.
(i) Each owner or operator must have a contingency plan for the facility. The contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of used oil to air, soil, or surface water.
(ii) The provisions of the plan must be carried out immediately whenever there is a fire, explosion, or release of used oil which could threaten human health or the environment.
2. Content of contingency plan.
(i) The contingency plan must describe the actions facility personnel must take to comply with
335-14-17-.06(3)(b)1. and 6. in response to fires, explosions, or any unplanned sudden or non-sudden release of used oil to air, soil, or surface water at the facility.
(ii) If the owner or operator has already prepared a Spill Prevention, Control, and Countermeasures (SPCC) Plan or some other emergency or contingency plan, the owner or operator need only amend that plan to incorporate used oil management provisions that are sufficient to comply with the requirements of 335-14-17.
(iii) The plan must describe arrangements agreed to by local police departments, fire departments, hospitals, contractors, and ADEM Field Operations Division and local emergency response teams to coordinate emergency services, pursuant to
335-14-17-.06(3)(a)6.
(iv) The plan must list names, addresses, and phone numbers (office and home) of all persons qualified to act as emergency coordinator [see
335-14-17-.06(3)(b)5.], and this list must be kept up to date. Where more than one person is listed, one must be named as primary emergency coordinator and others must be listed in the order in which they will assume responsibility as alternates.
(v) The plan must include a list of all emergency equipment at the facility [such as fire extinguishing systems, spill control equipment, communications and alarm systems (internal and external), and decontamination equipment], where this equipment is required. This list must be kept up to date. In addition, the plan must include the location and a physical description of each item on the list, and a brief outline of its capabilities.
(vi) The plan must include an evacuation plan for facility personnel where there is a possibility that evacuation could be necessary. This plan must describe signal(s) to be used to begin evacuation, evacuation routes, and alternate evacuation routes (in cases where the primary routes could be blocked by releases of used oil or fires).
4. Amendment of contingency plan. The contingency plan must be reviewed, and immediately amended, if necessary, whenever:
(i) Applicable regulations are revised;
(ii) The plan fails in an emergency;
(iii) The facility changes-in its design, construction, operation, maintenance, or other circumstances-in a way that materially increases the potential fires, explosions, or releases of used oil, or changes the response necessary in an emergency;
(iv) The list of emergency coordinators changes; or
(v) The list of emergency equipment changes.
5. Emergency coordinator. At all times, there must be at least one employee either on the facility premises or on call (i.e., available to respond to an emergency by reaching the facility within a short period of time) with the responsibility for coordinating all emergency response measures. This emergency coordinator must be thoroughly familiar with all aspects of the facility's contingency plan, all operations and activities at the facility, the location and characteristic of used oil handled, the location of all records within the facility, and facility layout. In addition, this person must have the authority to commit the resources needed to carry out the contingency plan.
Guidance: The emergency coordinator's responsibilities are more fully spelled out in 335-14-17-.06(3)(b)6. Applicable responsibilities for the emergency coordinator vary, depending on factors such as type and variety of used oil handled by the facility, and type and complexity of the facility.
6. Emergency procedures.
(i) Whenever there is an imminent or actual emergency situation, the emergency coordinator (or the designee when the emergency coordinator is on call) must immediately:
(I) Activate internal facility alarms or communication systems, where applicable, to notify all facility personnel; and
(II) Notify appropriate State of Alabama or local agencies with designated response roles if their help is needed.
(ii) Whenever there is a release, fire, or explosion, the emergency coordinator must immediately identify the character, exact source, amount, and areal extent of any released materials. He may do this by observation or review of facility records or manifests and, if necessary, by chemical analyses.
(iii) Concurrently, the emergency coordinator must assess possible hazards to human health or the environment that may result from the release, fire, or explosion. This assessment must consider both direct and indirect effects of the release, fire, or explosion (e.g., the effects of any toxic, irritating, or asphyxiating gases that are generated, or the effects of any surface water run-offs contaminated from water or chemical agents used to control fire and heat-induced explosions).
(iv) If the emergency coordinator determines that the facility has had a release, fire, or explosion which could threaten human health, or the environment, outside the facility, he must report his findings as follows:
(I) If his assessment indicated that evacuation of local areas may be advisable, he must immediately notify appropriate local authorities. He must be available to help appropriate officials decide whether local areas should be evacuated; and
(II) He must immediately notify either the government official designated as the on-scene coordinator for the geographical area (in the applicable regional contingency plan under Part 1510 of
40 CFR), or the National Response Center [using their 24-hour toll free number 800/424-8802 or 202/267-2675, and the Department 334/271-7700 between 8:00 a.m. and 5:00 p.m., Monday through Friday] or the Alabama Department of Public Safety (334/242-4378, 24 hours a day). The report must include:
1. Name and telephone number of reporter;
2. Name and address of facility;
3. Time and type of incident (e.g., release, fire);
4. Name and quantity of material(s) involved, to the extent known;
5. The extent of injuries, if any; and
6. The possible hazards to human health, or the environment, outside the facility.
(v) During an emergency, the emergency coordinator must take all reasonable measures necessary to ensure that fires, explosions, and releases do not occur, recur, or spread to other used oil or hazardous waste at the facility. These measures must include, where applicable, stopping processes and operation, collecting and containing released used oil, and removing or isolating containers.
(vi) If the facility stops operation in response to a fire, explosion, or release, the emergency coordinator must monitor for leaks, pressure buildup, gas generation, or ruptures in valves, pipes, or other equipment, wherever this is appropriate.
(vii) Immediately after an emergency, the emergency coordinator must provide for recycling, storing, or disposing of recovered used oil, contaminated soil or surface water, or any other material that results from a release, fire, or explosion at the facility.
(viii) The emergency coordinator must ensure that, in the affected area(s) of the facility:
(I) No waste or used oil that may be incompatible with the released material is recycled, treated, stored, or disposed of until cleanup procedures are completed; and
(II) All emergency equipment listed in the contingency plan is cleaned and fit for its intended use before operations are resumed.
(III) The owner or operator must notify the Department and other appropriate State of Alabama and local authorities that the facility is in compliance with
335-14-17-.06(3)(b)6.(viii)(I) and (II) before operations are resumed in the affected area(s) of the facility.
(ix) The owner or operator must note in the operating record the time, date and details of any incident that requires implementing the contingency plan. Within 15 days after the incident, he must submit a written report on the incident to the Department. The report must include:
(I) Name, address, and telephone number of the owner or operator;
(II) Name, address, and telephone number of the facility;
(III) Date, time, and type of incident (e.g., fire, explosion);
(IV) Name and quantity of material(s) involved;
(V) The extent of injuries, if any;
(VI) An assessment of actual or potential hazards to human health or the environment, where this is applicable;