Ala. Admin. Code r. 400-1-6-.01 - General

The design and construction of all wells and production facilities shall be based on sound engineering principles and must take into account the composition of the well stream, maximum pressures, and other pertinent engineering data and information. All flowing wells shall be produced through tubing anchored by a packer and shall be equipped with a master valve and adequate chokes or beans to properly control the flow thereof. The Supervisor may approve alternative procedures for properly controlling well flow, upon request by the operator.

Author: State Oil and Gas Board

Notes

Ala. Admin. Code r. 400-1-6-.01
Filed September 30, 1982. Repealed and New Rule: Filed April 11, 2000; effective May 16, 2000.

Statutory Authority: Code of Ala. 1975, ยงยง 9-17-1, et seq.

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.