Ala. Admin. Code r. 400-6-13-.01 - Gas Measurement

All gas injected or withdrawn shall be measured using meters designed, installed, and operated in accordance with industry standards and shall be acceptable to the Supervisor. The storage operator shall report the current gas in storage, injection and withdrawal volumes, average cavity pressures, and calculated storage capacity on Form OGB-17D, Monthly Report of Gas Injected/Withdrawn for Natural Gas Storage Facilities. The report shall be filed with the Board by the twenty-eighth (28th) day of the month subsequent to the period for which the report is made, or at such other time as prescribed by the Supervisor.

Author: State Oil And Gas Board

Notes

Ala. Admin. Code r. 400-6-13-.01
New Rule: Filed April 11, 2000; effective May 16, 2000.

Statutory Authority: Code of Ala. 1975, ยงยง 9-17-1 et seq.

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.