18 AAC 65.020 - Costs and expenditures
Current through April 6, 2022
(a) A grant may not be used to pay for a cost
of the project which was incurred before the grant was awarded or for a cost
associated with land right-of-way acquisitions, interest, financing, and
preparation of grant applications and comprehensive plans.
(b) The following costs are eligible costs
for which a grantee may expend money received from a grant:
(1) personnel, construction, contractual, and
administrative costs of a project
(A) which
are incurred as a direct result of litter reduction projects or the initiation
of resource recovery projects; or
(B) for the operation of resource recovery
projects, which are demonstrated by the grantee to be necessary to establish a
self-supporting operation; and
(2) the cost of supplies and equipment
incurred as a direct result of litter reduction and resource recovery projects
are grant-eligible; the department will determine the size and type of eligible
equipment upon consideration of the factors listed in
18 AAC 65.025.
(c) Subject to the availability of
funds and the requirements and limitations of this chapter, the department
will, in its discretion, make grant awards for up to 100 percent of eligible
costs not funded by other sources of funds.
Notes
Authority:AS 46.03.020(10)
AS 46.06.010
AS 46.06.040
AS 46.06.050
AS 46.06.070
AS 46.06.120
AS 46.06.130