18 AAC 80.210 - Department review; post-approval procedures
(a) The department
will issue its approval or denial to construct a community water system,
non-transient non-community water system, or transient non-community water
system within 30 days after the department receives all of the plans and
information required by this chapter. If the submittals are deficient, the
department will notify the owner that additional information is
needed.
(b) Failure of the
department to issue an approval or denial to construct within 30 days does not
constitute automatic approval of the plans.
(c) If the department grants an approval to
construct for a set of plans and specifications, the department will
(1) sign the construction portion of a
construction and operation certificate for public water systems;
(2) send a copy of the certificate, as signed
under (1) of this subsection, to the owner of the public water system;
and
(3) assign the public water
system an identification number.
(d) The department will not issue an approval
to construct a new community water system or a new non-transient non-community
water system if the department determines that the submitted plans,
specifications, and information do not meet the requirements of technical,
financial, and managerial capacity under
18 AAC 80.207.
(e) The department will issue a final
approval to operate for a new water well if raw water analyses submitted under
18 AAC 80.205(c)
(2) show that the minimum testing
requirements in Table B of that paragraph are met.
(f) A signed construction and operation
certificate for public water systems does not relieve the owner of the public
water system of the responsibility to
(1)
construct, operate, and maintain the system in compliance with this chapter;
or
(2) obtain a permit to
appropriate water under AS 46.15; or
(3) comply with other state law.
(g) A public water system that has
received a department approval to construct may not serve water for public
consumption until
(1) construction is
complete;
(2) the finished water
analyses for coliform bacteria and for any raw water contaminant that exceeded
an MCL under
18 AAC 80.300 are complete and
approved;
(3) based on the
requirements of this subsection, the department grants interim approval to
operate under (i) of this section; and
(4) for a new community water system or new
non-transient non-community water system, the terms and conditions set by the
department regarding financial and managerial capacity under
18 AAC 80.207 have been
met.
(h) The well logs
for a well intended to serve a public water system, including wells not in
operation but that are connected to the public water system on a standby basis
for purposes such as fire protection and emergencies, must be submitted to the
department within 30 days after the construction of the public water system.
The well log must contain the following information as applicable:
(1) the method of construction;
(2) the type of fluids used for
drilling;
(3) the location of the
well;
(4) an accurate log of the
soil and rock formations encountered and the depth at which the formations
occur;
(5) the depth of the
casing;
(6) the height of the
casing above ground;
(7) the depth
and type of grouting;
(8) the depth
of any screens;
(9) the casing
diameter;
(10) the casing
material;
(11) the depth of
perforation or opening in the casing;
(12) the well development method;
(13) the total depth of the well;
(14) the depth to the static water
level;
(15) the anticipated use of
the well;
(16) the maximum well
yield;
(17) the results of any well
yield, aquifer, or drawdown test that was conducted;
(18) if the water well contractor or person
who constructs the well installs a pump at the time of construction, the depth
of the pump intake and the pump performance data.
(i) If the department grants interim approval
to operate under (g) of this section, the department will
(1) sign the interim operation portion of a
construction and operation certificate for public water systems; upon the
department's signing of the interim operation section of the certificate,
operation of the water system for a 90-day interim period is
approved;
(2) send a copy of the
certificate, as signed under (1) of this subsection, to the owner.
(j) The department will grant
final approval to operate if
(1) record
drawings, signed and sealed by a registered engineer, are submitted during the
interim approval period;
(2) the
record drawings submitted under (1) of this subsection confirm that the system
meets the requirements of this chapter and provides public health
protection;
(3) all written terms
and conditions set by the department for the construction are met;
(4) for all new community water systems or
new non-transient non-community water systems, the new system meets the
technical capacity requirements of
18 AAC 80.207; and
(5) for a new community water system, new
non-transient non-community water system, or new transient non-community water
system, a summary of information, from the initial construction submittals of
plans and information required by this chapter, and from record drawings
required in (1) of this subsection, is
(A)
completed and signed by the registered engineer who signed and sealed the
record drawings; and
(B) submitted
on a current form provided, and in a format approved, by the department with
the request for final approval to operate.
(k) If the department grants final approval
to operate under (j) of this section, the department will
(1) sign the final operation portion of a
construction and operation certificate for public water systems; and
(2) send a copy of the certificate, as signed
under (1) of this subsection, to the owner.
(l) The department will waive the requirement
for submission of record drawings if it makes an onsite inspection and finds
that the system was constructed as approved. The owner shall pay the fee
required by
18 AAC 80.1910(a)
(1) for an onsite inspection conducted under
this subsection.
Notes
Authority:AS 46.03.020
AS 46.03.050
AS 46.03.710
AS 46.03.720