18 AAC 60.390 - Closure standards for a Class III MSWLF
(a) Closure of a
Class III MSWLF must conform to the requirements of this section and
18
AAC 60.396. The final cover on a Class III MSWLF must be
soil or another material approved by the department . The final cover must be at
least 24 inches thick, or another thickness approved by the department , must be
graded to promote drainage without erosion, and must be revegetated or otherwise
treated in a manner appropriate to the anticipated, future long-term use of the
facility.
(b) Within 90 days after
closure of a Class III MSWLF , the owner or operator shall submit written
notification to the department that closure has been completed as required by (a)
of this section.
(c) The owner or
operator shall establish permanent markers or survey monuments, if there are no
readily observable, existing monuments or markers, from which the exact location
of a facility and each closed portion of the facility can be
determined.
Notes
Authority:AS 44.46.020
AS 46.03.010
AS 46.03.020
AS 46.03.100
AS 46.03.110
AS 46.03.800
AS 46.03.810
AS 46.06.080
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.