(a) As used in the Professional Engineers
Act, the term "responsible charge" directly relates to the extent of control a
professional engineer is required to maintain while exercising independent
control and direction of professional engineering services or creative work and
to the engineering decisions which can be made only by a professional engineer.
(1) Extent of Control. The extent of control
necessary to be in responsible charge shall be such that the engineer:
(A) Makes or reviews and approves the
engineering decisions defined and described in subdivision (a)(2)
below.
(B) In making or reviewing
and approving the engineering decisions, determines the applicability of design
criteria and technical recommendations provided by others before incorporating
such criteria or recommendations.
(2) Engineering Decisions. The term
"responsible charge" relates to engineering decisions within the purview of the
Professional Engineers Act.
Engineering decisions which must be made by and are the
responsibility of the engineer in responsible charge are those decisions
concerning permanent or temporary projects which could create a hazard to life,
health, property, or public welfare, and may include, but are not limited
to:
(A) The selection of engineering
alternatives to be investigated and the comparison of alternatives for the
project.
(B) The selection or
development of design standards or methods, and materials to be used.
(C) The decisions related to the preparation
of engineering plans, specifications, calculations, reports, and other
documents for the engineered works.
(D) The selection or development of
techniques or methods of testing to be used in evaluating materials or
completed projects, either new or existing.
(E) The review and evaluation of
manufacturing, fabrication, or construction methods or controls to be used and
the evaluation of test results, materials, and workmanship insofar as they
affect the character and integrity of the completed project.
(F) The development and control of operating
and maintenance procedures.
(3) Reviewing and Approving Engineering
Decisions. In making or reviewing and approving engineering decisions, the
engineer shall be physically present or shall review and approve through the
use of communication devices the engineering decisions prior to their
implementation.
(b)
Responsible Charge Criteria. In order to evaluate whether an engineer is in
responsible charge, the following must be considered: The professional engineer
who signs engineering documents must be capable of answering questions asked by
individuals who are licensed by the Board in the appropriate branch of
professional engineering relevant to the project and who are fully competent
and proficient by education and experience in the field or fields of
professional engineering relevant to the project. These questions would be
relevant to the engineering decisions made during the individual's
participation in the project, and in sufficient detail to leave little question
as to the engineer's technical knowledge of the engineering performed. It is
not necessary to defend decisions as in an adversarial situation, but only to
demonstrate that the individual in responsible charge made, or reviewed and
approved, them and possessed sufficient knowledge of the project to make, or
review and approve, them.
Examples of questions to be answered by the engineer could
relate to criteria for design, methods of analysis, methods of manufacture and
construction, selection of materials and systems, economics of alternate
solutions, and environmental considerations. The individual should be able to
clearly express the extent of control and how it is exercised and to
demonstrate that the engineer is answerable within said extent of
control.
(c) Successor
Licensee. In situations when the professional engineer in responsible charge of
an engineering project is unavailable to complete the project or when the
project is a site specific adaptation of a previous design, a professional
engineer (hereinafter referred to as the "successor licensee") may assume
responsible charge of the project as long as the successor licensee exercises
the requisite extent of control and assumes responsibility for the engineering
decisions as required by subdivision (a) and meets the criteria described in
subdivision (b), as well as meeting the requirements of the Professional
Engineers Act and Sections
411 and
415. Except as provided in Section
6735, 6735.3, and 6735.4 of the Code, the original licensee is not relieved of
any responsibility arising from the engineering services of which he or she was
in responsible charge.
(d) Portions
of Projects. Nothing in this section prohibits a professional engineer from
providing services for portions of or to add to or to modify an engineering
project engineered under the responsible charge of another licensee as long as
the professional engineer exercises the requisite extent of control and assumes
responsibility for the engineering decisions as required by subdivision (a) and
meets the criteria described in subdivision (b), as well as meeting the
requirements of the Professional Engineers Act and Sections
411 and
415. The professional engineer
need only be in responsible charge of the portions, additions, or modifications
or the portion of the project affected by the addition or modification and not
of the entire project. Except as provided in Sections 6735(b), 6735.3(b), and
6735.4(b) of the Code, the original licensee is not relieved of any
responsibility arising from the engineering services of which he or she was in
responsible charge.
(e) The term
"responsible charge" does not refer to any of the following:
(1) the concept of financial
liability;
(2) management control
in a hierarchy of professional engineers except as each of the individuals in
the hierarchy exercises independent engineering judgment and thus responsible
charge;
(3) such administrative and
management functions as accounting, labor relations, personnel performance
standards, marketing of services, or goal setting. While an engineer may also
have such duties in this position, it should not enhance or decrease one's
status of being in responsible charge of the engineering.
Notes
Cal. Code Regs.
Tit. 16, §
404.1
1. New section
filed 2-4-77; effective thirtieth day thereafter (Register 77, No.
6).
2. Amendment filed 4-12-78; effective thirtieth day thereafter
(Register 78, No. 15).
3. Amendment of section heading filed
8-10-83; effective thirtieth day thereafter (Register 83, No.
33).
4. Amendment of section heading, section and NOTE filed
8-29-2005; operative 9-28-2005 (Register 2005, No.
35).
Note: Authority cited: Section
6716,
Business and Professions Code. Reference: Sections
6701,
6703,
6704.1,
6705,
6730.2,
6734,
6734.1,
6734.2,
6735,
6735.3,
6735.4,
6736.1,
6737.1,
6738,
6749,
6755,
6775
and
6788,
Business and Professions Code.
1. New section filed
2-4-77; effective thirtieth day thereafter (Register 77, No. 6).
2.
Amendment filed 4-12-78; effective thirtieth day thereafter (Register 78, No.
15).
3. Amendment of section heading filed 8-10-83; effective
thirtieth day thereafter (Register 83, No. 33).
4. Amendment of
section heading, section and Note filed 8-29-2005; operative 9-28-2005
(Register 2005, No. 35).