Article 98 - Operating Rules
- § 4990 - Scope
- § 4991 - Travel
- § 4991.1 - Ground Conditions
- § 4992 - Booms
- § 4993 - Swing
- § 4993.1 - Work Area Control
- § 4994 - Hoisting
- § 4995 - Riding Loads on Derricks, Hoists, or Cranes
- § 4996 - Driver's Position
- § 4997 - Fire Extinguisher
- § 4998 - Refueling
- § 4999 - Handling Loads
- § 5000 - Limit Switches
- § 5001 - Signals - General Requirements
- Plate I - Recommended Hand Signals for Controlling Crane Operations, version 2
- § 5001.1 - Signals - Radio, Telephone or Other Electronic Transmission of Signals
- § 5001.2 - Signals - Voice Signals - Additional Requirements
- § 5001.3 - Signal Person Qualifications - Supplemental Requirements for Cranes and Derricks in Construction
- § 5002 - Overhead Loads
- § 5003 - Provisions for Preventing Accidents in the Area of High-Voltage Lines
- § 5003.1 - Power Line Safety (up to and Including 350kv) - Equipment Operations
- § 5003.2 - Power Line Safety (over 350kv)
- § 5003.3 - Power Line Safety (All Voltages) - Equipment Operations Closer than the Table a Zone
- § 5003.4 - Power Line Safety - While Traveling Under or near Power Lines with NO Load
- § 5004 - Crane or Derrick Suspended Personnel Platforms
- § 5005 - Work near Transmitter Towers
- § 5006 - Crane and Hoisting Equipment Operators-Qualifications
- § 5006.1 - Mobile Crane and Tower Crane - Operator Qualifications and Certification (Applicable to Cranes in General Industry Only)
- § 5006.2 - Operator Training, Certification, and Evaluation for Cranes and Derricks in Construction
- § 5008 - Operating Practices
- § 5008.1 - Operation
- § 5009 - Floor-Operated Cranes
- § 5010 - Assembly/Disassembly - Selection of Manufacturer or Employer Procedures
- § 5010.1 - Assembly/Disassembly - General Requirements (Applies to All Assembly and Disassembly Operations)
- § 5010.2 - Disassembly - Additional Requirements for Dismantling of Booms and Jibs (Applies to Both the Use of Manufacturer Procedures and Employer Procedures)
- § 5010.3 - Assembly/Disassembly - Employer Procedures - General Requirements
- § 5010.4 - Power Line Safety (up to and Including 350kv) - Assembly and Disassembly
- § 5011 - Fall Protection - Supplemental/Specific Requirements for Cranes
- § 5012 - Training - Supplemental Requirements for Cranes in Construction
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.