1 CCR 212-3-4-220 - Regulated Marijuana Testing Program: R&D Testing

Basis and Purpose - 4-220

The statutory authority for this rule includes but is not limited to sections 44-10-202(1)(c), 44-10-203(1)(a), 44-10-203(1)(c), 44-10-203(1)(g), 44-10-203(1)(k), 44-10-203(2)(d), 44-10-203(2)(f), 44-10-203(3)(d), 44-10-203(3)(e), 44-10-501(6), 44-10-502(3), 44-10-503(8), 44-10-504(1)(b), 44-10-504(2), 44-10-601(4), 44-10-602(4), 44-10-603(6), 44-10-604(1)(b), and 44-10-604(2), C.R.S. Authority also exists in the Colorado Constitution at Article XVIII, Subsection 16(5)(a) (VII). The purpose of this rule is to protect the public health and safety by establishing R&D testing procedures and rules for the Division's Regulated Marijuana sampling and testing program. This Rule 4-220 was previously Rules 4-105, 1 CCR 212-3, Rules M and R 1504, 1 CCR 212-1 and 1 CCR 212-2.

A. R&D Testing. A Regulated Marijuana Business may submit Test Batches from a Harvest Batch (including a Manicure Batch) or Production Batch for R&D testing. R&D testing may be performed for any test required by these 4-200 Series Rules or any other test.
1. Harvest Batches or Production Batches that are Designated in the Inventory Tracking System as an R&D batch.
a. The Regulated Marijuana from these batches shall not be Transferred to other Regulated Marijuana Businesses except for Regulated Marijuana Testing Facilities.
b. Failing R&D test results do not require compliance with failed test procedures and are not considered a failing result for the purposes of achieving or maintaining Reduced Testing Allowance.
2. Harvest Batches or Production Batches that are Intended to be Transferred to other Regulated Marijuana Businesses.
a. Passing R&D Test Results. If a Harvest or Production Batch passes an R&D test it shall not constitute a pass for the purposes of compliance with required contaminant or potency testing. If a Harvest or Production Batch passes an R&D test it shall not constitute a pass for purposes of achieving or maintaining a Reduced Testing Allowance. See Rules 4-210 and 4-230.
b. Failed R&D Test Results. If a Harvest or Production Batch fails an R&D test:
i. It does not require compliance with failed test procedures. See Rule 4-240.
ii. If a Test Batch fails an R&D test that is a test type required by these Rules, the Licensee must submit a Test Batch from the same Harvest or Production Batch for compliance testing and obtain passing results for that test type prior to Transferring that Harvest or Production Batch to a Regulated Marijuana Business.
iii. If the Test Batch submitted pursuant to paragraph (1)(b)(ii)(B) fails testing, compliance with the failed test procedures in Rule 4-240 is required.
iv. Licensees shall not Transfer Regulated Marijuana that they have reason to believe would not pass testing required by Rule 4-210 and 4-215, unless otherwise authorized in these rules.

Notes

1 CCR 212-3-4-220
47 CR 21, November 10, 2024, effective 12/4/2024

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.