1 CCR 301-85-5 - Application
5.1. Application
Requirements.
5.1.1. Application forms shall
be available from the Governor's Energy Office and on the Office website at
www.colorado.gov/energy/
5.1.2. Applications shall be sent to the
Office in electronic form sent to the following email address
REEESLoan@state.co.us with one hard copy provided via first class mail. Each
application shall be in a form prescribed by the Office and shall include the
items described in Section 5 of these rules.
5.1.3. The Office shall assess the merit of
the expected benefits of the Renewable Energy Project or Energy Efficiency
Project by reviewing the technical eligibility and merit of the Applicant's
project. The Office shall provide a written report, make a recommendation to
the State Treasurer as to whether to award the loan and the amount of the loan
and notify the Applicants in writing that the Office's recommendations have
been sent to the State Treasurer no more than forty-five (45) days after the
application deadline.
5.1.4. The
State Treasurer shall evaluate and review the financial aspects of the
Application and the Colorado Energy Office's recommendation and make the final
loan decision based on its findings and the Office's technical opinion and
recommendation and any other considerations he or she deems relevant. Pursuant
to §
22-92-107(2)(a) and
(b), the State Treasurer shall determine the
amount of the Public School Fund that may be loaned, which Qualified School
Districts shall receive loans, the amount of each loan, the terms of repayment
of each loan and the rate of interest to be charged on loans. The average rate
of interest charged on loans made in any calendar year must at least equal the
average book yield earned by the Public School Fund in the most recently
completed quarter. Payments of the principal of and interest on all loans shall
be returned to the Public School Fund.,
5.2. Information to be provided by an
applicant.
5.2.1. Project Name: Provide the
full name of the proposed Renewable Energy or Energy-Efficient
Project.
5.2.2. Applicant
Information: Name, position, phone and fax number, and email address of the
contact person within the Qualified School District.
5.2.3. Renewable Energy Project Team: Name,
position, phone and fax number, and email address of the team
members.
5.2.4. A detailed
description of the scope and nature of the Renewable Energy Project or Energy
Efficiency Project;
5.2.5. The
estimated amount of Financial Assistance needed for the Renewable Energy
Project or Energy Efficiency Project;
5.2.6 For renewable energy projects, the
applicant should include information that demonstrates that the facility
qualifies for the federal energy star label or meets the efficiency
requirements set forth in section
22-32-123.3, C.R.S.;
5.2.7. Proposed Technology
5.2.6.1. Renewable Energy Project or Energy
Efficiency Project Information.
5.2.6.1.1. A
copy of any existing master plan or facility assessment relating to the
Facility or Facilities for which Financial Assistance is sought.
5.2.6.1.2. Renewable Energy Technology. A
detailed description of the type of technology the Qualified School District
proposes to use and why such technology would reduce energy costs by the
implementation of the technology.
5.2.6.1.3. Equipment
Specifications.
5.2.6.1.4.
Monitoring. A detailed description of the methodology used to monitor the
energy produced by the Renewable Energy Project, or the Energy Efficiency
Project and plans for ongoing monitoring.
5.2.6.1.5. The estimated annual energy that
will be generated by the Renewable Energy Project or Energy Efficiency
Project.
5.2.6.2. The
following information shall be provided in the application for an Energy
Efficiency Project:
5.2.6.2.1. A detailed
description of the how the installation of equipment and related infrastructure
will help defray energy costs as well as any other benefits such as improved
maintainability, improved mechanical systems and equipment, adding insulation
or otherwise improving the building envelope, adding or incorporating solar
thermal technologies, reduced operating costs, improved occupant comfort or
improved operations management.
5.2.6.2.2. The estimate of the amount of
energy consumption and water consumption saved from implementing each of the
proposed efficiency improvement(s) as well as any assumptions used to calculate
those values.
5.2.6.2.3. If
applying for a motor vehicle efficiency project, provide a detailed description
of how the energy efficiency of motor vehicle fleets will be optimized through:
adoption of alternative fuel vehicles (AFVs); "right sizing" of fleets; and/or
bench marking, tracking and monitoring of vehicle usage with clear implications
for improved fuel efficiency and addition of fuel-saving technologies to
existing vehicles.
5.2.7. Project Capital Costs. The application
shall include information on the annual operation and maintenance costs,
including but not limited to the following:
5.2.7.1. Project Annual Operation and
Maintenance Costs
5.2.7.2. Project
Annual Benefits
5.2.7.2.1. Economic
Benefits
5.2.7.2.3. Other
environmental and health benefits
5.2.7.2.4. If the project benefit
calculations depend on sales of energy to any outside purchaser, a copy of the
energy purchase agreement must be included with the application.
5.2.8. Preferred Method
of Repayment. Qualified School Districts shall state the term and payment
schedule that best fits their necessities.
5.2.9. An explanation of how the Qualified
School District shall use the Renewable Energy Project(s) or Energy Efficiency
Project(s) to educate the students in the Qualified School District about
renewable energy and energy efficiency.
5.2.10. Certification. Every application must
contain the signatures of the Qualified School District superintendent.
5.2.10.1. An application for a project at a
charter school must include signatures of the Qualified School District
superintendent, charter school board officer, and the charter school
director;
5.2.11. Any
other information that the Office may require for the evaluation of the
project.
5.3. In order to
apply, a Qualified School District shall also provide the following
information:
5.3.1. For Renewable Energy
Projects: An Energy Rating for the Facility for which the loan is intended that
demonstrates that the Facility qualifies for the Federal Energy Star label, or
meets the energy efficiency requirements set forth in §
22-32-124.3, C.R.S. OR
5.3.2. For Energy Efficiency Projects: An
Energy Efficiency Plan that is created by the Applicant, in consultation with
the Office, which includes:
5.3.2.1. A list
of cost-effective energy-saving measures and programs that the Applicant will
implement; and
5.3.2.2. Actions
that the applicant will take to implement, monitor, review, and revise the
energy efficiency plan.