Fla. Admin. Code Ann. R. 62C-16.003 - Applications Required
(1) The
requirements to submit applications, notices and reports contained in this
chapter shall be consistent with the department's authority contained in Part
III of Chapter 378, F.S.
(2)
Approval must be obtained from the department prior to an operator beginning
any reclamation and restoration activities on lands subject to this rule. The
following applications are required:
(a)
Conceptual plan.
(b) Conceptual
plan modification. Each operator must obtain an approved conceptual plan
modification for any change to its approved conceptual reclamation plans, in
accordance with the criteria contained in Rules
62C-16.0041
and
62C-16.0051,
F.A.C., unless the proposed change is exempt under subsection
62C-16.0041(3)
or (4), F.A.C., from needing a conceptual
plan modification.
(c) Variances.
Each operator must obtain an approved variance for any exception to the
provisions of this chapter in accordance with the criteria identified in
Section 378.212, F.S., and Rule
62C-16.0045,
F.A.C.
(3) Each operator
shall provide the department with the following notices and reports:
(a) Notice of Disturbance.
(b) Annual Mining and Reclamation
Report.
(c) Notice of Change in
Ownership or Mine Operator. All changes in land ownership and operators at a
mine shall be reported to the department no later than 30 days after the
effective date of such change.