Fla. Admin. Code Ann. R. 62C-37.010 - Release Procedures
(1) Upon
completion of reclamation requirements in an area, the operator shall notify
the department.
(2) Within 60 days
after receipt of the notification, the department shall notify the operator in
writing whether or not an inspection will be made within one year after receipt
of the operator's notification. The department's notification shall include the
date the inspection will occur, if an inspection is scheduled.
(3) Within 30 days after the inspection, the
department shall notify the operator in writing that the area is released or
what work must be done before release can be granted.
(4) If the department notifies the operator
that the area will not be inspected, the area shall be released from
reclamation requirements at the end of the second year after receipt of the
operator's notification.
(5) If an
operator wishes to resume mining operations within a released area, the area to
be disturbed shall be considered to be an undisturbed area for the purposes of
this chapter and application shall be made in accordance with the full
provisions of this chapter.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.