Fla. Admin. Code Ann. R. 61E1-5.001 - Removal of Asbestos-Containing Resilient Floor Cover or its Adhesive
The Department or its contractual designee may periodically inspect and oversee projects concerning the removal of asbestos-containing resilient floor cover or its adhesive. Such inspections shall be for the purposes of determining that the resilient floor covering is a Category I nonfriable material as defined in NESHAP and remains a Category I nonfriable material during removal activity and that all such removal activities are performed in accordance with all applicable asbestos standards of the United States Occupational Safety and Health Administration under 29 C. F. R., Part 1926. Upon completion of such inspections, the Department or its contractual designee shall submit a written report verifying the date, time, place and company performing the removal of the asbestos-containing resilient floor cover or its adhesive and certification that all conditions required pursuant to Section 469.002(3), F.S., have been met.
Notes
Rulemaking Authority 455.2035, 469.011 FS. Law Implemented 469.002(3) FS.
New 3-14-04.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
The Department or its contractual designee may periodically inspect and oversee projects concerning the removal of asbestos-containing resilient floor cover or its adhesive. Such inspections shall be for the purposes of determining that the resilient floor covering is a Category I nonfriable material as defined in NESHAP and remains a Category I nonfriable material during removal activity and that all such removal activities are performed in accordance with all applicable asbestos standards of the United States Occupational Safety and Health Administration under 29 C. F. R., Part 1926. Upon completion of such inspections, the Department or its contractual designee shall submit a written report verifying the date, time, place and company performing the removal of the asbestos-containing resilient floor cover or its adhesive and certification that all conditions required pursuant to Section 469.002(3), F.S., have been met.
Notes
Rulemaking Authority 455.2035, 469.011 FS. Law Implemented 469.002(3) FS.
New 3-14-04.