Chapter 62-672 - MINIMUM REQUIREMENTS FOR EARTHEN DAMS USED IN PHOSPHATE MINING AND BENEFICIATION OPERATIONS AND FOR DIKES USED IN PHOSPHOGYPSUM STACK SYSTEM IMPOUNDMENTS
- § 62-672.100 - [Repealed] General
- § 62-672.200 - Definitions
- § 62-672.300 - Construction of New Dams
- § 62-672.400 - Operational Requirements
- § 62-672.500 - Inspections
- § 62-672.550 - Contingency Plans
- § 62-672.570 - Non-Clay Phosphate Mining Impoundments
- § 62-672.600 - Construction of New Perimeter Earthen Dikes
- § 62-672.620 - [Repealed] Assessment of Existing Perimeter Earthen Dikes
- § 62-672.650 - Operational Requirements for Perimeter Earthen Dikes
- § 62-672.670 - Inspection and Maintenance Requirements for Perimeter Earthen Dikes
- § 62-672.700 - Construction of New Phosphogypsum Stacks
- § 62-672.720 - [Repealed] Assessment of Existing Phosphogypsum Stacks
- § 62-672.750 - Procedures for Raising Phosphogypsum Stacks
- § 62-672.760 - Procedures for Decanting Process Water from Top of Phosphogypsum Stack
- § 62-672.770 - Phosphogypsum Stack Inspection and Maintenance
- § 62-672.780 - Phosphogypsum Stack System, Operation Plans
- § 62-672.800 - Training
- § 62-672.850 - Contingency Plans
- § 62-672.870 - Emergency Measures
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.