12 - Reporting Requirements

12. Reporting Requirements

12.1

The permittee shall immediately notify the director of the incident and identify the pollutant(s) source(s) and the proposed and implemented control or mitigative measures as required in section 16 of appendix A of chapter 11-55.

12.2

The permittee shall notify the director of the construction start date through the e-Permitting portal within seven (7) calendar days before the start of construction activities. All communication with the department shall include the file number and the certification statement. The notification will only be accepted from the person qualified in accordance with section 11-55-34.08(f).

The following state regulations pages link to this page.