Idaho Admin. Code r. 58.01.01.796 - APPLICABILITY
01.
Permit by Rule. Owners and
operators of nonmetallic mineral processing plants are deemed to have a permit
by rule if they comply with all of the applicable provisions of Sections
795 through
799. Nothing in Sections
795 through
799 precludes any owner or operator
from obtaining a permit. Portable sources that operate or may be operated at a
single location or site of operations for more than twelve (12) consecutive
months must obtain a permit to construct. (3-28-23)
02.
Permit Option. Owners and
operators of nonmetallic mineral processing plants that hold a valid permit to
construct or a Tier II operating permit must comply with the terms and
conditions of the permit and are not subject to the requirements of the permit
by rule in Sections 795 through
799. (3-28-23)