Ill. Admin. Code tit. 32, § 605.40 - Experience of the Firm; Performance History Requirements
Current through Register Vol. 46, No. 15, April 8, 2022
a) The Agency shall select as contractor a
proposer who has demonstrated an ability to design, develop, construct, operate
and close a low-level radioactive waste disposal facility that incorporates the
best available management technologies that are economically reasonable,
technologically feasible and environmentally sound. When evaluating whether a
proposer has demonstrated this ability, the Agency shall evaluate the
proposer's experience developing and operating a low-level radioactive waste
storage, treatment or disposal facility. If a proposer does not have experience
in both the development and operation of a low-level radioactive waste disposal
facility, the Agency shall evaluate the proposer's experience as either a
low-level radioactive waste disposal facility developer or as a disposal
facility operator, or the proposer's experience in radioactive materials
management, hazardous materials management, nuclear fuel cycle facility design,
construction, or operation, or other related experience presented by the
proposer.
b) The proposer shall
provide a complete performance history of its activities as described in
subsection (a). When evaluating the proposer's experience, the Agency shall
consider for each project:
1) general
information about the project, including:
A)
the facility and its location;
B)
the capacity of the facility;
C)
the actual performance of the facility;
D) the type of storage, treatment or disposal
method used;
E) the proposer's role
in the project (i.e., design, construction, operation);
F) project initiation and completion
dates;
G) current facility status
and, if closed, the reason for closure;
H) the proposer's client;
I) current facility manager business address
and phone;
2) the
complexity and scope of the previous project, such as, but not limited to, the
previous projects' budget, duration, staffing and regulatory
complexity;
3) the success of the
project, i.e., whether the proposer met the objectives of the project in a
timely manner, without exceeding anticipated costs and in a manner consistent
with regulatory requirements, as well as whether the client was satisified with
the proposer's performance;
4)
whether the proposer has ever forfeited a performance bond or neglected to
fulfill contract responsibilities;
5) whether the proposer has ever initiated or
defended litigation arising from the activities, as described in the
performance history, as well as the nature and outcome of the
litigation;
6) the proposer's
history with respect to licensing and regulatory compliance, including any
record of safety violations or other compliance problems; and
7) any other information provided by the
proposer.
Notes
Amended at 37 Ill. Reg. 12414, effective July 19, 2013