Ill. Admin. Code tit. 83, § 315.40 - Pole Inspections

Current through Register Vol. 46, No. 15, April 8, 2022

After the "post-construction" inspection, further inspection of CATV pole plant, at CATV's cost, is prohibited except when the regulated entity submits to the CATV operator a statistically reliable survey evidencing the fact that the CATV operator has failed to report more than 5% of his attachments or is in noncompliance on 5% or more of the poles to which it is attached. The CATV operator shall be allowed 30 days to rebut said survey. If the surveys are in conflict, the Commission shall decide any dispute on petition of either party. Thereafter, if a survey is conducted, the CATV operator shall be required to pay the cost of same if the survey is borne out (more than 5% failure to report rate is shown or more than 5% non-compliance is found), provided that any non-compliance is not caused by the regulated entity.

Notes

Ill. Admin. Code tit. 83, § 315.40

Added at 18 Ill. Reg. 676, effective February 1, 1994

The following state regulations pages link to this page.



State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.