Part 556 - QUALIFYING INFRASTRUCTURE PLANT SURCHARGE
- § 556.10 - Definitions
- § 556.20 - Applicability
- § 556.30 - Terms and Conditions
- § 556.40 - Qualifying Infrastructure Plant, or QIP
- § 556.50 - Recoverable Costs - Return on QIP
- § 556.60 - Determination of the QIP Surcharge Percentage
- § 556.70 - Application for QIP Surcharge Tariff
- § 556.80 - Approval or Withdrawal of QIP Surcharge Tariff
- § 556.90 - Information Sheet Filings to Amend the QIP Surcharge
- § 556.100 - Annual Reconciliation
- § 556.110 - Annual Internal Audit
- § 556.120 - Gas Utility Commitments
- § 556.130 - Annual QIP Plan Update
Current through Register Vol. 46, No. 15, April 8, 2022
Notes
Emergency rules adopted at 37 Ill. Reg. 13567, effective August 5, 2013, for a maximum of 150 days; adopted at 38 Ill. Reg. 1998, effective December 27, 2013.
AUTHORITY: Implementing Section 9-220.3 and authorized by Sections 9-220.3 and 10-101 of the Public Utilities Act [220 ILCS 5/9-220.3 and 10-101].