312 IAC 29-28-2 - Establishment of internal mechanical integrity for Class II wells
Authority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 2.
(a)
Establishment of internal mechanical integrity includes:
(1) proper placement of the packer in
accordance with subsection (b) or (c); and
(2) successful performance of a pressure test
in accordance with subsection (e).
(b) Injection shall be through tubing and
packer unless alternative construction methods are approved by the division.
The packer shall be placed no higher than two hundred (200) feet above the
uppermost perforations or the casing seat in an open hole completion, provided
the packer is:
(1) within the cemented portion
of the production casing such that there is at least fifty (50) feet of cement
above the packer; and
(2) no less
than one hundred (100) feet below the base of the fresh water.
No perforations shall be left open above the packer unless they are isolated by a dual packer or concentric packer system. If a dual packer is used, the uppermost packer must satisfy the placement requirements of this subsection.
(c) The permittee shall contact the division
at least twenty-four (24) hours prior to the initial setting or any resetting
of the packer in a Class II well to enable an oil and gas inspector to be
present when the packer is set.
(d)
The owner or operator shall establish internal mechanical integrity:
(1) before initial injection into a newly
permitted Class II well;
(2) before
initial injection into a Class II well after any workover of the well involving
the resetting or movement of a packer;
(3) before resuming injection into any Class
II well after a change to a new, permitted injection zone;
(4) before initial injection into a Class II
well after the well has been reactivated from temporary abandonment
status;
(5) whenever the division
has reason to believe, based upon well records or field observation, that the
well may be leaking or was improperly constructed;
(6) at least once every five (5) years
measured from the date mechanical integrity was last established unless the
well has been temporarily abandoned in accordance with
312 IAC 29-31-3; and
(7) before resuming the injection of fluids
after repairs are made following failure of the well to pass a pressure
test.
(e) The owner or
operator shall comply with the following requirements for conducting pressure
tests to establish internal mechanical integrity of a Class II well:
(1) Notice shall be given to the division at
least twenty-four (24) hours before conducting a pressure test.
(2) The setting depth of the packer and the
results of the pressure test shall be verified by a representative of the
operator and reported to the division on a form prescribed by the
division.
(3) The casing-tubing
annulus above the packer shall be filled with fluid and the pressure tested
under the supervision of the division.
(4) Except as provided under section 3 of
this rule, the fluid used to fill the casing-tubing annulus shall be a
liquid.
(5) The test pressure shall
be a minimum of three hundred (300) pounds per square inch with a pressure
differential between the tubing and the annulus of fifty (50) pounds per square
inch.
(6) The test pressure shall
be maintained with a pressure differential of no more than three percent (3%)
over a period of thirty (30) minutes.
(7) The well may be operating or shut in
during the test.