312 IAC 29-28-4 - Establishment of external mechanical integrity for Class II wells

Authority: IC 14-10-2-4; IC 14-37-3

Affected: IC 14-37

Sec. 4.

(a) In conjunction with the establishment of internal mechanical integrity for Class II wells, the external mechanical integrity shall be evaluated by the division to establish that underground sources of drinking water are protected from upward migration of injection fluids.
(b) To establish external mechanical integrity, all Class II wells shall be constructed in accordance with 312 IAC 29-20-7 through 312 IAC 29-20-9.
(c) If external mechanical integrity of a Class II well drilled in accordance with 312 IAC 29-20-7 through 312 IAC 29-20-9 cannot be demonstrated by cement records, the owner or operator may establish external mechanical integrity through one (1) or more of the following methods:
(1) A temperature or noise log indicating top of cement.
(2) A cement bond log showing gamma ray, transit time, collar locator, and variable density log.
(3) Advanced cement evaluation logs.
(4) Radioactive tracer survey indicating lack of fluid migration behind the casing.
(5) Oxygen-activation log indicating lack of fluid migration behind the casing.
(6) Another method authorized by the division upon a demonstration by the owner or operator that the test applies methods and standards generally accepted in the petroleum industry that have been found reliable for demonstrating external mechanical integrity.

Notes

312 IAC 29-28-4
Natural Resources Commission; 312 IAC 29-28-4; filed 12/1/2017, 10:35 a.m.: 20171227-IR-312160230FRA Readopted filed 1/17/2023, 1:53 p.m.: 20230215-IR-312220328RFA

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.