312 IAC 29-33-15 - Placement of cement behind uncemented casings

Authority: IC 14-37-3

Affected: IC 14-37

Sec. 15.

(a) This section establishes requirements for ensuring the placement of cement behind uncemented casing strings when plugging any well.
(b) If cement is not present outside a casing at each cement plug required in this rule, an owner or operator must remove, perforate, part, or rip the casing at fifty (50) foot intervals to ensure adequate cement is placed in the annular space behind the casing. The division may require an owner or operator to run a cement bond-variable density log if sufficient information is not otherwise available to determine the location of the cement outside the casing.

Notes

312 IAC 29-33-15
Natural Resources Commission; 312 IAC 29-33-15; filed 12/1/2017, 10:35 a.m.: 20171227-IR-312160230FRA Readopted filed 1/17/2023, 1:53 p.m.: 20230215-IR-312220328RFA

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.