312 IAC 29-33-17 - Cased hole bottom plugs other than horizontal coal bed methane wells
Authority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 17.
(a) This
section establishes requirements for setting a bottom plug in a cased well
other than a horizontal coal bed methane well.
(b) If an owner or operator uses the
circulation method, and except as provided in subsection (d), a cement plug
must be placed across each completed interval and across each exposed interval
into which injection is occurring within a one-fourth (1/4) mile radius of the
well. The bottom cement plug shall be set beginning from the shallower of:
(1) fifty (50) feet below the deepest
completed interval; or
(2) total
depth or plugged back total depth.
The plug shall extend at least two hundred fifty (250) feet above the uppermost completed interval.
(c) If an owner or operator uses the dump
bailer method, and except as provided in subsection (d), a cast iron bridge
plug must be set inside the cemented portion of the casing immediately above
either:
(1) each completed interval with a
minimum of ten (10) feet of cement placed on top of each cast iron bridge plug;
or
(2) the lowermost completed
interval and the well bore casing filled with cement to fifty (50) feet above
the top of the uppermost completed interval, with the production casing or well
bore annulus filled with cement to fifty (50) feet above the uppermost
completed interval.
(d)
Instead of setting a bottom plug under subsection (b) or (c), an owner or
operator may do the following:
(1) If using
the circulation method, place cement from total depth to three (3) feet below
ground elevation.
(2) For any well
with two (2) or fewer completed zones and circulated casing, except a well
flowing gas or fluid to the surface, use surface pumping or bullhead pumping of
cement from the uppermost perforated zone to three (3) feet below the
surface.
(3) For a horizontal well,
instead of setting the cement bottom plug from total depth or plugged back
total depth, either of the following methods may be used:
(A) The well bore shall be filled with mud up
to the kick-off point, and a cement plug of not less than two hundred fifty
(250) feet shall be placed above that point.
(B) A cast iron bridge plug shall be set
inside the cemented production casing below the kick-off point as low in the
well as the curve will allow, and a cement plug of not less than two hundred
fifty (250) feet shall be placed on top of the bridge plug.
(e) Regardless of the
method used for placing cement, an owner or operator must place a cast iron
bridge plug at the locations identified in subsection (c)(1) and (c)(2) in any
well that is flowing gas or fluid to the surface.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.