312 IAC 29-33-3 - Deferring the plugging and abandoning of a well
Authority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 3.
(a) An owner
or operator may defer the plugging and abandoning of a well as required under
section 1 of this rule for a well that has been drilled, completed, and cased
for production, if:
(1) the well is otherwise
in compliance with IC 14-37 and this article; and
(2) the owner or operator satisfies the
requirements of this section.
(b) The owner or operator shall specify the
date by which the well is intended to be plugged, which shall not be more than
one (1) year from the date of providing notice under this section.
(c) For any well that a notice of intent to
defer plugging and abandonment is provided, the owner or operator shall do the
following:
(1) Equip the well with an intact,
leak-free well head or cap the well with a valve configured to monitor casing
or casing tubing annulus pressure.
(2) If requested by the division director,
demonstrate that the well does not threaten an underground source of drinking
water by:
(A) monitoring well head pressures
and fluid levels in the well; or
(B) performing a mechanical integrity test on
the casing.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.