327 IAC 5-9-3 - Permit terms and conditions
Authority: IC 13-14-8; IC 13-15-1-2; IC 13-15-2-1; IC 13-18-3
Affected: IC 13-18-4; IC 13-18-19
Sec. 3.
(a) BMPs
specified by an applicable EPA-promulgated regulation under section 304(e) of
the CWA shall be expressly incorporated into an NPDES permit.
(b) In establishing BMP requirements in an
NPDES permit on a case-by-case basis as the commissioner determines to be
necessary to carry out the provisions under section 402(a)(1) of the CWA, the
commissioner shall consider the following factors:
(1) toxicity of the pollutant(s);
(2) quantity of the pollutant(s) used,
produced, or discharged;
(3)
history of NPDES permit violations;
(4) history of significant leaks or spills of
toxic or hazardous pollutants;
(5)
potential for adverse impact on public health, e.g., proximity to a public
water supply or the environment, e.g., proximity to a sport or commercial
fishery; and
(6) any other factors
determined to be relevant to the control of toxic or hazardous pollutants. BMP
requirements which may be imposed under this subsection include, without
limitation, dikes and other containment structures, stormwater diversion
structures, and similar measures as well as operational practices such as
periodic plant inspections, preventive maintenance, and plant
housekeeping.
(c) Best
management practices may be established in permits under subsection (b) alone
or in combination with those required under subsection (a).
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.