Kan. Admin. Regs. § 112-107-1 - Electronic gaming machine requirements
(a) Each electronic gaming machine (EGM)
approved for use in a gaming facility shall meet the requirements of article
110.
(b) Unless a facility
manager's electronic gaming monitoring system is configured to automatically
record all of the information required by this article, the facility manager
shall be required to house the following entry authorization logs in each EGM:
(1) A machine entry authorization log that
documents each time an EGM or any device connected to the EGM that could affect
the operation of the EGM is opened. The log shall contain, at a minimum, the
following:
(A) The date and time of
opening;
(B) the purpose for
opening the EGM or device;
(C) the
signature and the license or permit number of the person opening and entering
the EGM or device; and
(D) if a
device, the asset number corresponding to the EGM in which the device is
housed; and
(2) a
progressive entry authorization log that documents each time a progressive
controller not housed within the cabinet of the EGM is opened. The log shall
contain, at a minimum, the following:
(A) The
date and time of opening;
(B) the
purpose for accessing the progressive controller; and
(C) the signature and the license or permit
number of the person accessing the progressive controller. Each log shall be
maintained in the progressive controller unit and have recorded on the log a
sequence number and the gaming supplier's serial number of the progressive
controller.
(c) Each EGM shall be equipped with a lock
controlling access to the card cage door securing the microprocessor, and the
lock's key shall be different from any other key securing access to the EGM's
components, including its belly door or main door, bill validator, and
electronic gaming cash storage box. Access to the key securing the
microprocessor shall be limited to a supervisor in the security department. The
department's director of security shall establish a sign-out and sign-in
procedure for the key, which shall include notification to commission staff
before release of the key.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.