Kan. Admin. Regs. § 28-31-10 - Hazardous waste monitoring fees
Each reference in this regulation to a federal regulation shall mean that federal regulation as adopted by reference in K.A.R. 28-31-124 through 28-31-279.
(a) Fee requirement. Each of the following
persons shall pay an annual monitoring fee to the department according to the
requirements of subsections (b) through (e):
(1) Each owner or operator of a hazardous
waste treatment, storage, or disposal facility;
(2) each hazardous waste transporter;
and
(3) each hazardous waste
generator.
(b) Hazardous
waste treatment, storage, or disposal facilities. The owner or operator of each
facility shall pay the annual monitoring fee before January 1 of each year.
(1) The fee for each active facility shall be
based on the following schedule:
| (A) On-site storage facility ........................... | $10,000 |
| (B) Off-site storage facility ............................ | $10,000 |
| (C) On-site nonthermal treatment facility ...... | $10,000 |
| (D) Off-site nonthermal treatment facility ..... | $12,000 |
| (E) On-site thermal treatment facility ............ | $12,000 |
| (F) Off-site thermal treatment facility ............ | $18,000 |
| (G) On-site landfill or underground injection | |
| well ................................................................ | $14,000 |
| (H) Off-site landfill or underground injection well ................................................................ | $18,000 |
(2)
The fee for each facility subject to postclosure care shall apply upon receipt
by the department of the certification of closure specified in
40 CFR
264.115 or
40 CFR
265.115. This fee shall be $14,000.
(3) The owner or operator of each facility
conducting more than one of the hazardous waste activities specified in
paragraphs (b)(1) and (2) shall pay a single fee. This fee shall be in the
amount specified for the activity having the highest fee of those
conducted.
(c) Hazardous
waste transporters. Each hazardous waste transporter shall pay the annual
monitoring fee when the transporter registers with the department in accordance
with K.A.R. 28-31-6, and before January 1 of each subsequent year. This fee
shall be $200.
(d) Hazardous waste
generators.
(1) Each large quantity generator
shall pay the annual monitoring fee before March 1 of each year.
(A) The fee shall be based on all hazardous
waste generated during the previous calendar year according to the following
schedule:
| Total Yearly Quantity Generated | Monitoring Fee |
| Less than or equal to 5 tons ........................................ | $300 |
| Greater than 5 tons but less than or equal to 50 tons ....... | $900 |
| Greater than 50 tons but less than or equal to 500 tons | $2,800 |
| Greater than 500 tons ............................................. | $8,000 |
(B)
Each large quantity generator that reclaims hazardous waste on-site to recover
substantial amounts of energy or materials shall be exempt from payment of
monitoring fees for the amount of hazardous waste reclaimed. This exemption
shall not apply to hazardous waste residues produced during
reclamation.
(2) Each
small quantity generator and each Kansas small quantity generator shall pay the
annual monitoring fee of $150 before April 1 of each year.
(e) Monitoring fee payments. Each monitoring
fee payment that is made by check or money order shall be made payable to the
"hazardous waste management fund -Kansas department of health and environment."
This regulation shall be effective on and after July 1, 2012.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.