Kan. Admin. Regs. § 28-45-17 - Mechanical integrity test; casing evaluations
(a) Each permittee shall submit a plan to
conduct a mechanical integrity test to the department for the secretary's
review and consideration for approval before beginning a mechanical integrity
test. A mechanical integrity test shall not proceed without approval by the
secretary. Each plan shall include the following information:
(1) The type and method of the mechanical
integrity test proposed;
(2)
specification of whether the test is for the casing, cavern, or both;
(3) justification for test parameters and
calculations;
(4) test
sensitivities;
(5) test
calibrations; and
(6) the pass and
fail criteria for the test.
(b) Each mechanical integrity test shall be
completed as follows:
(1) Before a storage
well and cavern is considered an active well;
(2) every five years for each active
well;
(3) before conversion to
monitoring status or permanent monitoring status if a mechanical integrity test
has not been completed within the last five years;
(4) before plugging; and
(5) after each workover on the storage well
casing that involves changes to any cemented casing string.
(c) Each permittee shall conduct a
mechanical integrity test on each active well by using an interface test
capable of identifying the location of a leak according to the following:
(1) Each mechanical integrity test on the
storage well casing shall demonstrate sensitivity to detect a leakage rate in
the casing of at least 100 barrels of fluid per year.
(2) Each mechanical integrity test on a
storage cavern shall demonstrate sensitivity to detect a leakage rate of at
least 1,000 barrels of fluid per year.
(d) Any permittee may use a hydraulic casing
test if approved by the department before plugging, conversion to monitoring
status, or conversion to permanent monitoring status.
(e) Each permittee shall ensure that each
mechanical integrity test uses certified gauges and pressure transducers that
have been calibrated within one year of the mechanical integrity test
date.
(f) Each permittee shall
submit results and a written summary report of each mechanical integrity test
within 90 days of completion. Each permittee shall have a professional engineer
or professional geologist review and certify each mechanical integrity test
result and report. Each report shall include the following information:
(1) A chronology of the mechanical integrity
test procedures;
(2) copies of all
logs, including a narrative interpretation by a logging expert of each
log;
(3) storage well and cavern
completion information, including schematics;
(4) pressure readings;
(5) volume measurements;
(6) an interpretation of the mechanical
integrity test results and calculations, including an explanation of identified
anomalies and any issues or problems with any storage well and
cavern;
(7) an adjusted maximum
allowable operating pressure, if the mechanical integrity test was not
conducted at the currently permitted gradient; and
(8) a signature by a professional engineer or
professional geologist certifying the mechanical integrity test
results.
(g) No
permittee shall use a storage well if the mechanical integrity test is not
certified by a professional engineer or professional geologist.
(h) Each permittee shall notify the
department if a storage well fails a mechanical integrity test within one week
of the failed mechanical integrity test. If a storage well fails a mechanical
integrity test, the storage well shall be considered out of service and each
permittee shall meet the following requirements:
(1) Complete an approved method to assess
cavern roof, top of salt, and any trapped product;
(2) demonstrate mechanical integrity using an
alternative method approved by the department;
(3) remove all feasible product;
(4) fill the cavern with saturated brine;
and
(5) submit a plan to convert a
storage well to monitoring status or permanent monitoring status or submit a
plan to remediate the storage well within two years of the failed mechanical
integrity test.
(i) Each
permittee shall complete a casing evaluation for each active well. Each
permittee shall submit a written plan for a casing evaluation to the department
for the secretary's review and consideration for approval, at least 30 days
before beginning the casing evaluation.
(j) Each casing evaluation shall be completed
as follows:
(1) Every five years for a storage
well with single casing;
(2) every
10 years for a storage well with double casing or a production casing and a
cemented liner; and
(3) before
conversion of a storage well from monitoring status to an active
well.
(k) Each permittee
shall submit the casing evaluation report to the secretary for review and
consideration for approval, within 90 days of completion. Each casing
evaluation report shall include the following information:
(1) A copy of any logs that were
completed;
(2) a detailed written
interpretation of any logs that were completed;
(3) a description of the presence of any
metal loss due to either corrosion or wear;
(4) the degree of penetration of the
corrosion or the casing defect;
(5)
the circumferential extent of the corrosion or the casing defect;
(6) any calculations used in the casing
evaluation; and
(7) a signature by
a professional engineer certifying the review and analysis of the casing
evaluation.
(l) Each
permittee shall submit a cement bond log with the casing evaluation if a cement
bond log is not currently on file with the department.
(m) A professional engineer or professional
geologist, or a professional engineer's or professional geologist's designee,
shall supervise each mechanical integrity test and any associated field
activities.