Kan. Admin. Regs. § 82-11-8 - Customer installations: location and monitoring responsibility
(a) For residential
and small commercial customers, the operator may locate a meter at either the
customer's building wall or the customer's property line or easement.
(b) For industrial and large
commercial customers, the operator's meter location shall be determined by
mutual agreement between the operator and the customer. Each location shall
provide for an adequate margin of safety from public road and on-site traffic.
Each customer shall be responsible for notifying the operator of any changes in
on-site traffic patterns or other conditions that could subsequently render the
agreed-upon meter location unsafe. Before installing the meter, each operator
shall provide written notice to the customer of the customer's obligation to
monitor and report potential unsafe conditions.
(c) For each residential customer
installation placed in service after May 1, 1989, the operator shall ensure
that the installation or repair of all yard lines meets the design,
installation, testing, maintenance, and replacement requirements specified in
K.A.R. 82-11-4, K.A.R. 82-11-6, K.A.R. 82-11-7, K.A.R. 82-11-9, and K.A.R.
82-11-10.
(d) For each residential
customer installation placed in service before May 1, 1989, the operator shall
ensure that the installation or repair of all yard lines meets the testing,
maintenance, and replacement requirements specified in K.A.R. 82-11-4, K.A.R.
82-11-6, K.A.R. 82-11-7, K.A.R. 82-11-9, and K.A.R. 82-11-10.
(e) Notwithstanding the requirements of
subsections (c) and (d), the following requirements shall apply to residential
customer installations located in class 1 areas with maximum operating
pressures of 10 p.s.i.g. or less:
(1) For
each residential customer installation placed in service before May 1, 1989,
the operator shall perform leak surveys in accordance with K.A.R. 82-11-4(dd).
All other installation, testing, maintenance, and replacement requirements
specified in K.A.R. 82-11-4, K.A.R. 82-11-6, K.A.R. 82-11-7, K.A.R. 82-11-9,
and K.A.R. 82-11-10 shall apply only to that portion of the yard line within
150 feet of a building wall.
(2)
For each residential customer installation placed in service on or after May 1,
1989, the operator shall perform leak surveys in accordance with K.A.R.
82-11-4(dd). All other design, installation, testing, maintenance, and
replacement requirements specified in K.A.R. 82-11-4, K.A.R. 82-11-6, K.A.R.
82-11-7, K.A.R. 82-11-9, and K.A.R. 82-11-10 shall apply only to that portion
of the yard line within 150 feet of a building wall.
(f) Each residential, customer-owned
installation shall be provided with odorized gas and maintained according to
the requirements of K.A.R. 82-11-4(dd).
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.