Kan. Admin. Regs. § 5-3-5d - Requirement to install a water level measurement tube

Current through Register Vol. 40, No. 39, September 30, 2021

Each well with an authorized maximum rate of diversion of 100 or more gallons per minute drilled after the effective date of this regulation, except those wells authorized under a temporary permit or a domestic right, shall have a tube installed in accordance with specifications adopted by the chief engineer. This tube shall be suitable for making water level measurements and shall be maintained in working condition.

Notes

Kan. Admin. Regs. § 5-3-5d
Authorized by K.S.A. 82a-706a; implementing K.S.A. 82a-706a and K.S.A. 82a-706c; effective May 1, 1980; amended Sept. 22, 2000; amended Oct. 31, 2008.

The following state regulations pages link to this page.



State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.